+44(0)75 9606 1095

Get in Touch

Hochtief Murphy JV – Thames Tideway, Lee Tunnel

In STRUCTURES ENGINEERING

Vanguard World was responsible for the preparation of the geotechnical report for a 7km tunnel in East London. The 7km tunnel design involved several shafts of diameters of up to 30m and 80 to 90m deep. Analysis and interpretation of the factual report deriving geotechnical design parameters.